Process · Welcome to the future of homebuilding
Built smarter. Built faster.
Forget weather delays, budget blowouts and endless site disruptions. Our modular process brings the precision of modern manufacturing to residential architecture — your home is built in our climate-controlled facility while your site is being prepped, cutting the standard construction timeline in half.
The timeline
How we cut your build time in half.
Two builds start the same week. Only one of them is finished by week 16. Traditional building is linear — you can't build the walls until the foundation is poured. We build in parallel.
The traditional way
Linear
Weeks 1–4
Design, engineering & council approvals
Weeks 5–10
Site excavation & foundation pouring
Weeks 11–16
Framing, roofing, waiting on weather
Weeks 17–24+
Electrical, plumbing, plaster, fit-out
Still months away from move-in.
Our modular way
Parallel
Weeks 1–4
Home chosen & enquiry in — design, engineering & council approvals
Weeks 5–10
Site excavation happening simultaneously with factory framing & fit-out
Weeks 11–16
Modules delivered, craned & assembled in days — then final connections
Weeks 17–24+
—
Ready to move in.
One process, step by step
From your browser to your front door.
Choosing your home and building it are one journey: four steps with our team, three on site.
Step 1
Browse the range
Start with a home, not a blank page.
From one-bedroom backyard homes to three-bedroom family homes, every ProG design is already engineered around the pod system — so what you see is what can actually be built.
Step 2
Check the package
Know exactly what's included.
Each home lists its layout, dimensions, inclusions and specifications up front — floor plans, finishes schedule and energy rating — so you can compare like for like before you talk to anyone.
Step 3
Enquire — tell us your site
Your block, your constraints, your timing.
Send an enquiry with the home you like and what you know about your land. If you're not sure whether a design fits, our land check will tell you in a couple of minutes.
Step 4
ProG scopes and prices it
Scope confirmed before hard pricing.
We review your site, confirm assumptions and follow up — hard pricing never appears before the scope is settled. Then our engineers model every millimetre in 3D BIM and manage the council approval process.
Step 5
The parallel phase
Maximum efficiency. Zero weather delays.
Two things happen at exactly the same time: on site, our crew clears the land, connects the underground utilities and installs the engineered footings; in the factory, your modules are framed, insulated, plumbed and wired in a dry, climate-controlled environment.
Step 6
Delivery & assembly
Watch your home arrive.
Your completed modules are transported to your property, craned into place and locked onto the engineered footings. Within days your home is fully assembled, weather-tight and structurally secured.
Step 7
Final finishes & handover
The perfect polish.
We connect the services — water, power, sewer — seamlessly patch the interior joints between modules, complete any exterior decking or landscaping, and walk you through a rigorous final quality-assurance check before handing over the keys.